• Task: Installation of concrete curbing and synthetic turf.
• Reason: To make the surrounding area of the flagpole more beautiful and reduce maintenance.
• Process: JJ Leon crew graded and leveled existing ground, set forms and poured concrete for curbing. We installed base and synthetic turf, all work performed "in-house."