• Task: Reinforce deteriorated existing sea wall.
• Reason: The existing sea wall was deteriorated and failing.
• Process: Cut the existing asphalt, and excavated for the new wall footing. Installed steel to reinforce the concrete. Poured concrete for the footing, and “shotcrete” for the upright wall.