• Task: Expand and remodel an existing building
• Reason: Base personnel needed more office spaces
• Process: The JJ Leon crew excavated for the foundation, and poured concrete for the new foundation. Erected the exterior block walls, put in for window space in the block walls. Extended utilities to the newly built structure. Installed steel studs and drywall for the interior frame work, and we installed a parapet wall for the roof.